Concrete or Wood-Frame Condo: What the Difference Means for Buyers
When you compare condos in the Lower Mainland, one question comes up early: is the building concrete or wood-frame? Here is how condo buildings here are typically built, what the structure can and can't tell you about sound, fire protection, leaks, maintenance and strata fees, and how to confirm what a building is made of before you remove subjects.
The short version
Towers are typically concrete. Mid-rise buildings can be concrete or wood-frame, since BC's Building Code allows wood-frame residential buildings up to six storeys, and low-rise buildings and townhouses are usually wood-frame. Many buildings mix the two, such as wood-frame floors over a concrete parkade. Neither type is always better, and neither guarantees quiet. The leaky condo problems in buildings from the 1980s and 1990s were traced to wall design and construction choices, and a building's age, upkeep and finances can tell you as much as its structure. Read the depreciation report, ask for engineering reports, check the minutes for leaks and noise, ask about sprinklers and insurance, and compare strata fees with what they pay for.
How condo buildings here are built
Condo buildings here generally fall into these groups, or combine them:
- Concrete. High-rise towers are typically concrete, and so are many mid-rises. A study for the City of Vancouver describes the typical high-rise there as a concrete structure with window wall glazing and a concrete parkade below.
- Wood-frame. In 2009, BC became the first province to allow wood-frame residential buildings of up to six storeys. Low-rise condo buildings and townhouses are usually wood-frame, and so are many buildings of four to six storeys.
- Mass timber. These use large engineered wood panels and columns. BC's Building Code allows encapsulated mass timber construction up to 18 storeys for residential buildings.
- Hybrids. A wood-frame building still sits on a concrete foundation, and on a concrete parkade if it has one. An 18-storey student residence at UBC has mass timber floors over a concrete podium, with concrete cores around the stairs and elevators.
BC's Building Code doesn't apply in the City of Vancouver, which has its own building bylaw. Either way, a building is designed to the code in force for its building permit, so its age matters as much as its structure.
Sound between homes
Buyers often ask me whether concrete is quieter. No structure guarantees quiet. The Building Code sets minimum sound ratings for the walls and floors between homes, but how a building sounds day to day also depends on its design, its flooring, where your unit sits and who lives around you. Before you remove subjects:
- Visit at different times. An evening or weekend visit tells you more than a quiet weekday showing.
- Check the flooring rules. Look for bylaws or rules on hard flooring and underlay, and ask whether neighbours have changed their floors.
- Read the minutes. Noise complaints and bylaw fines can show up in council minutes.
- Look at what's next door. Units beside elevators, garbage rooms, mechanical rooms or the parkade gate can hear more.
Fire protection and insurance
Concrete is noncombustible, while wood-frame buildings count as combustible construction under the Building Code, which caps wood-frame residential buildings at six storeys. In any building, fire safety also depends on fire separations, alarms, sprinklers and maintenance. Rules change over time: BC began requiring sprinklers on the balconies of new four-storey wood-frame residential buildings in July 2017, so older ones may not have them. Ask the strata manager whether the building is sprinklered throughout, including balconies, and when its fire systems were last inspected.
Construction also matters for insurance. BCFSA, BC's financial services regulator, has noted that a building's risk profile for insurers depends on factors including its claims history, age, type of construction, maintenance and distance to fire hydrants. The strata's premium and deductibles flow into your strata fees and into what your own policy needs to cover. Form B includes a summary of the strata's insurance coverage, and I explain the owner's side in Condo Insurance in BC.
The building envelope and the leaky condo era
The building envelope is the roof, walls, windows, doors and balconies: everything that keeps rain out. BC's leaky condo problems were envelope failures. The provincial commission of inquiry into condominium construction, which reported in 1998, pointed to face-sealed wall systems, widely used on condominiums in the 1980s and 1990s, and to design features unsuited to our climate, and it noted large, complex wood-frame condominiums built under rules meant for smaller buildings. Cities such as Vancouver, Richmond and New Westminster changed their building rules to call for rainscreen walls with a drainage cavity behind the cladding. I cover the warning signs and what to check in Leaky Condos in BC.
New homes built for sale generally carry home warranty insurance under BC's Homeowner Protection Act: two years on materials and labour, five years on the building envelope, including water getting in, and ten years on the structure, with any remaining coverage passing to the next owner (see New Home Warranty in BC). Concrete buildings have envelopes too, with windows, seals and roofs that need upkeep and eventual replacement. Whatever the structure, ask whether the envelope has been assessed or renewed, when, and with what warranty.
Maintenance, elevators and parking
Every building ages, but not in the same places. A depreciation report's component inventory, based on an on-site visual inspection, lists and evaluates the building's major parts, and its 30-year forecast shows what repairs and replacements may cost. Read it with the structure in mind:
- Exterior. Check when the report expects the roof, walls, windows and balconies to need work, and compare that with the reserve fund balance. In a tower with window wall, ask about the glazing and its seals; in a wood-frame building, ask about the cladding, balconies and decks.
- Elevators. A tower may rely on several, a mid-rise on one or two, and some smaller buildings have none. Check their age and when the report expects them to be modernized or replaced.
- Parkade. An underground parkade has its own waterproofing, drains, ventilation and gate, usually maintained by the strata. Look for those items in the report and for parkade repairs in the minutes.
I explain how to read the forecast and funding models in Depreciation Reports in BC.
Strata fees and the reserve fund
Neither structure comes with a set level of strata fees. Fees fund the strata's operating budget, which covers costs that come up every year, such as insurance, utilities, maintenance contracts, management and any staff or amenities, plus a contribution to the contingency reserve fund for larger, less frequent work. Under the Strata Property Regulation, that contribution must be at least 10% of the operating fund contribution, and it must be set after considering the latest depreciation report.
So compare what the fees pay for. A tower with a concierge, a pool and several elevators has different costs from a three-storey building with none of those, and a low fee can mean a thin reserve rather than an inexpensive building. If big projects are coming and the reserve is small, the gap can come back as higher fees, a special levy or a loan. I go through the budget lines in Strata Fees in BC.
How to find out what you're looking at
- The listing, then the documents. A listing may describe the construction, but confirm it in the strata's records.
- The depreciation report. If the strata has one, it comes attached to the Form B information certificate. Stratas with five or more lots must get one on a five-year cycle from a qualified professional.
- Engineering reports. Ask for any building envelope assessment, structural review or parkade report, and whether the strata acted on it.
- Minutes. Two years or more of council and general meeting minutes can show leaks, repairs, insurance claims and noise complaints.
- The strata plan. Filed at the Land Title Office, it shows the boundaries of the strata lots, common property and limited common property, not the materials.
- The strata manager. Ask what the structure is, whether it's sprinklered throughout, when the envelope was last renewed and whether any warranty is left.
Questions buyers often ask me
Is a concrete condo always quieter than a wood-frame one?
Not always. Both are built to minimum sound ratings in the Building Code, and how quiet a home feels also depends on the design, the flooring, the unit's location and the neighbours. Visit at different times and read the minutes for noise complaints.
How tall can a wood-frame building be in BC?
BC's Building Code allows wood-frame residential buildings up to six storeys, a change the province made in 2009. Taller wood buildings can be built with encapsulated mass timber, which the code allows up to 18 storeys for residential use. Vancouver has its own building bylaw.
Is every older wood-frame condo a leaky condo?
No. A building's era is a reason to look closer, not a verdict. Ask whether the walls have been assessed or rebuilt, what warranty is left, and what the depreciation report and minutes say about leaks and upcoming envelope work.
Do concrete buildings have higher strata fees?
Not necessarily. Fees follow each strata's budget: insurance, utilities, staff, amenities, elevators and the reserve contribution. A building with low fees and a thin reserve can cost owners more later, so compare what the fees cover with the work coming up.
How can I confirm how a building is constructed?
Start with the depreciation report attached to the Form B, which lists the building's components. Then read any engineering reports and the minutes, and ask the strata manager about the structure, sprinklers and envelope history, including any warranty left.
Comparing buildings? Read about the strata documents to read before you buy, what changes when buying a presale condo, or how buying a townhouse differs from a condo.
Comparing condo buildings?
I would be glad to help you compare buildings and get the strata documents that answer these questions. Call or text 778-834-1706, email silvana@silvanaazurdia.ca or send me a message. Happy to help in English or Spanish.
This article is general information, not professional advice. The details come from the BC government, the Strata Property Act and Regulation, BC Housing, BCFSA, the City of Vancouver, UBC and the 1998 provincial commission of inquiry into condominium construction, and were current at the time of writing; an engineer or home inspector can assess a specific building. For the Province's summary, see strata depreciation report requirements.
Recent Posts











