Buying a Waterfront or Creekside Home in BC: Foreshore, Docks and Setbacks
A home on the ocean, a lake, a river or a creek raises questions an inland lot never does: where the property ends at the water, who owns the beach, whether the dock is authorized, and how close you can build, clear or protect the bank. Here is what I suggest checking before you buy a waterfront or creekside home in BC, and who to ask.
The short version
A waterfront lot in BC usually ends at the natural boundary, the visible high water mark. Below it, the foreshore and the bed of the water generally belong to the Province, and the boundary shifts as the shore slowly erodes or builds up. A dock needs its own permission, usually from the Province or, in its waters, the port authority, and must meet federal rules and local zoning. Near a stream, provincial riparian rules and city permit areas limit building and clearing close to the bank. Seawalls and bank protection need approvals too. Before you remove subjects, get a survey, read the title, check the septic setbacks and the dock paperwork, and ask the local government what applies to that lot.
Where your lot ends at the water
Most waterfront lots in BC end at the natural boundary. The Land Act defines it as the visible high water mark, where the water has marked the soil and vegetation so they look distinct from the banks. The foreshore lies between the high and low water marks, and the Province says it owns nearly all of it, fresh and salt water. Under the Land Act, the bed and shore below the natural boundary don't pass with a Crown grant unless the grant expressly says so.
- The line can move. BC's Surveyor General describes natural boundaries as ambulatory: they shift as a shore gradually erodes or builds up, so the boundary on the ground can differ from the registered plan. Land lost to erosion returns to the Crown.
- Fill doesn't make it yours. Filled Crown land below the natural boundary can't be granted without the minister's order, and the Province's dock rules don't allow fill below it.
- Check that the lot reaches the water. Read the registered plan, and watch for a public road end beside the lot: when waterfront land is subdivided, the Land Title Act generally requires road access to the water at set intervals.
Docks and moorage: who says yes
A dock reaches out over the foreshore, which is usually Crown land, so permission comes from whoever manages that water.
- Provincial foreshore. Under the Province's private moorage program, a dock, boat ramp or boat lift that meets the conditions of a General Permission is deemed authorized without an application. Others need a Specific Permission or a lease. I explain these for lake cabins in Buying a Cabin or Recreational Property in BC.
- Port waters. The Vancouver Fraser Port Authority, whose jurisdiction takes in parts of Burrard Inlet and the Fraser River, says every recreational dock there needs its licence, and a new dock or work on an existing one needs a project permit.
- Federal rules. On navigable water, Transport Canada lets docks and boathouses that meet its minor works criteria go ahead without an approval. The Fisheries Act prohibits harmful alteration of fish habitat unless Fisheries and Oceans Canada (DFO) authorizes it, and DFO publishes a code of practice for residential docks.
- Local rules. The Province says a dock that doesn't comply with local bylaws and zoning isn't eligible for its authorization.
Buying a home that already has a dock
A dock that has stood for years isn't proof that it is authorized. Ask the seller for whatever covers it: a Specific Permission or lease, a port licence and permit, local permits, and records of when it was built.
- Tenures don't follow the title. BC Assessment notes that the title transfer doesn't update foreshore tenure records. A Specific Permission has to be assigned to the new owner; for a General Permission dock, the buyer updates the owner's details with BC Assessment.
- Separate tax notices. BC Assessment can send notices for a private dock separately from the house, so ask for every roll number tied to the property, and check the Province's iMapBC mapping service to see whether a tenure exists.
Streamside setbacks and permit areas
BC's Riparian Areas Protection Regulation applies to local governments in Metro Vancouver (outside the City of Vancouver), the Fraser Valley and other regional districts. Where it applies, residential, commercial or industrial development within 30 m of a stream that provides fish habitat, and farther at some ravines, generally can't go ahead without a qualified environmental professional's assessment report, and the work must follow it. Two definitions are broad:
- Stream. A watercourse or body of water, even if usually dry, plus a ditch, spring or wetland connected to one by surface flow.
- Development. Adding, removing or altering soil, vegetation or a structure. Pitt Meadows' guidance lists clearing, hard surfaces, trails and docks.
A local government can rely on its own streamside bylaws instead if it considers they protect as well or better, so ask which rules apply. In Surrey, a property with any part within 50 m of the top of bank of a stream the City classes as fish habitat is in a development permit area, so building, clearing or subdividing generally needs a permit first. The District of North Vancouver's streamside permit area generally covers land within 15 m of a stream's top of bank, more in some cases, including streams not yet mapped; an environmental professional finds the top of bank, and it is shown on a legal survey.
Flooding, erosion and shore protection
Floodplain maps, flood construction levels and flood insurance are in Floodplains and Flood Insurance. Waterfront lots can also sit in hazard permit areas: Surrey's covers flood-prone land in the 200-year floodplain and steep slopes, and the District of North Vancouver's creek hazard area covers properties near creeks at risk of flooding, debris floods or debris flows, where new living space needs an engineer's or geoscientist's assessment. Protecting an eroding bank takes approvals too:
- Lakes, rivers and creeks. Building flood or erosion protection is a change in and about a stream under the Water Sustainability Act, and the Province says it needs a change approval.
- The ocean. The Province's seawall guidance says private property generally extends to the high water mark, working from the beach generally needs a Crown permit, and a local building permit is likely. A seawall's owner is generally responsible for storm damage it causes to other properties.
- Fish and navigation. DFO's mandate covers work that could affect fish or spawning areas, and on navigable water, Transport Canada's rules for erosion protection include posting project information on a public registry.
Title, survey, septic and subject clauses
- Title. A section 219 covenant in favour of the Province or a local government binds later owners and can say that part of the land isn't to be built on or must stay in its natural state. A statutory right of way can give a local government or utility rights over part of the lot. See Reading a Title Search in BC.
- Survey. A BC land surveyor can show the present natural boundary, and any top of bank, relative to the house, the dock and any seawall.
- Septic. BC's Sewerage System Standard Practice Manual calls for a new dispersal field to sit at least 30 m from a permanent freshwater body and 15 m from the ocean or an intermittent stream. An older system may sit closer, and a narrow lot may leave little room for a replacement. My guide to buying an acreage in the Fraser Valley covers septic records and inspections.
- Subject clauses. Allow time to get the survey, review the dock paperwork and permits, confirm with the city what applies, get an insurance quote and inspect the septic. See Subject Clauses in BC.
Questions buyers often ask me
Do I own the beach in front of a waterfront home?
Usually not. A waterfront lot in BC generally ends at the natural boundary, and the foreshore below it is usually Crown land, which the Province's own guidance calls public beach. The registered plan and a current survey show where your lot ends.
Does the dock come with the house?
Its authorization doesn't follow automatically. A Specific Permission or lease has to be assigned to you, a General Permission dock has to keep meeting the conditions, and in port authority waters every recreational dock needs the port's licence. Ask for the paperwork early and make it part of your subject clauses.
Can I build closer to the creek than the existing house?
Often not without approvals. Near a stream that provides fish habitat, the city or regional district generally needs a qualified environmental professional's assessment before it approves building or clearing, under the provincial regulation or its own streamside rules. Ask it early what applies to the lot.
Can I add a seawall or riprap to stop erosion?
Possibly, but plan for several approvals. On a lake, river or creek, it needs a change approval from the Province under the Water Sustainability Act. On the ocean, expect a local building permit and a Crown permit to work from the beach. Fish habitat rules apply to both.
What happens to my boundary if the shoreline moves?
A natural boundary moves with slow, natural erosion or build-up, so the line on the ground can differ from the registered plan, and eroded land becomes Crown land. Fill or excavation generally doesn't move it. A BC land surveyor can show where the present natural boundary is.
Weighing a home by the water? Read about buying a home for the view, how easements, rights of way and shared driveways work, and checking zoning and nearby development.
Looking at a waterfront or creekside home?
I can help you plan the checks, from the survey and dock paperwork to the right subject clauses, and connect you with the professionals who do them. Call or text 778-834-1706, email silvana@silvanaazurdia.ca or send me a message. Happy to help in English or Spanish.
This article is general information, not legal advice. The details come from the Province of BC (including the Land Act, the private moorage program, the Riparian Areas Protection Regulation and the Sewerage System Standard Practice Manual), BC's Surveyor General, BC Assessment, the Vancouver Fraser Port Authority, Transport Canada, Fisheries and Oceans Canada, Surrey, Pitt Meadows and the District of North Vancouver, and were current at the time of writing; what applies depends on the body of water and the local government. For the Province's dock rules, see private moorage on Crown land.